TW EIA 104 05 104 07

Consent Order Addendum - Submission Pursuant to Paragraph 2.a - August 26, 2021

Please find enclosed the Interim Seep Remediation Seep A Effectiveness Demonstration Report. This report is being submitted by Chemours pursuant to paragraph 2.a of the Addendum to Consent Order Paragraph 12, entered by the Bladen County Superior Court on October 12, 2020.

Submission of Drinking Water Compliance Plan Pursuant to Consent Order Paragraph 24 April 26, 2019

Pursuant to Paragraph 24 of the Consent Order, please find enclosed the Drinking Water Compliance Plan prepared by Parsons on behalf of Chemours.

Work Plan for Toxicity Studies Pursuant to Consent Order Paragraph 14 March 27, 2019

Paragraph 14 of the Consent Order states: “Within thirty (30) days of entry of this Consent Order, Chemours shall submit a plan and proposed schedule for review and approval by DEQ for funding and facilitating the conducting of an initial set of toxicity studies by a qualified third party approved by DEQ relating to both toxicity assays informative to human health and aquatic life sufficient to aid in development of surface water and groundwater regulatory standards for up to five PFAS as determined by DEQ. The plan shall provide for the studies and parameters identified in Attachment B as well as technologically feasible dosing parameters to be agreed upon by Chemours and DEQ.”

RESIDENTIAL DRINKING WATER PROGRAM INVESTIGATION WELL SAMPLING LOCATIONS WITH RESULTS AS OF SEPTEMBER 6, 2023

CHEMOURS CHAMBERS WORKS COMPLEX DEEPWATER, NEW JERSEY

Independent Assurance Statement to The Chemours Company

ERM Certification and Verification Services (‘ERM CVS’) was engaged by The Chemours Company (‘Chemours’) to provide limited assurance in relation to the indicators for the year ending December 31st, 2018, set out below and presented in the 2020 Chemours Corporate Responsibility Commitment (CRC) Index Report (the ‘CRC Report’).

Fayetteville ISO 9001 Certificate

Development and manufacture of Fluorocarbon Chemicals, Fluorocarbon Resin and Fluorinated Membranes.

THERMAL OXIDIZER CONTROL EFFICIENCY COMPLIANCE TEST REPORT TEST DATES: 28-29 FEBRUARY 2020

THE CHEMOURS COMPANY FAYETTEVILLE, NORTH CAROLINA

Interim SEEP Remediation Operation and Maintenance Report #2

This Operations and Maintenance Report #2 (O&M Report #2) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A and C from March 1 through April 30, 2021.

Chemours Chambers Works Surveying and PFAS Sampling Program Residential GAC System Results – 2Q22

The E.I. du Pont de Nemours and Company voluntarily conducted a residential drinking-water well surveying and sampling program within a two-mile radius surrounding the Chambers Works Facility in Deepwater, New Jersey in 2009.