Search Results

Below are the search engine results of your query.

Showing 2141-2150 of 2808 results

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - FOURTH QUARTER 2021 REPORT

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Cape Fear River PFAS Mass Loading Assessment report for The Chemours Company, FC, LLC (Chemours).

CFR Long-Term Remedy Performance Monitoring Report #3 July – September 2023

This CFR Long-Term Remedy Performance Monitoring Report #3 (“Report”) has been prepared for the Q3 2023 period of July 1 through September 30, 2023 and documents the continued operation of the interim seep Flow-Through Cells (FTCs), the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP).

Cape Fear River PFAS Mass Loading Assessment - Fourth Quarter 2022 Report

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Cape Fear River PFAS Mass Loading Assessment report for The Chemours Company, FC, LLC (Chemours).

CFR Long-Term Remedy Performance Monitoring Report #2 April-June 2023

This CFR Long-Term Remedy Performance Monitoring Report #2 (“Report”)1 has been prepared for the Q2 2023 period of April 1 through June 30, 2023 and documents the continued operation of the interim seep Flow-Through Cells (FTCs), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP); the commissioning and startup of the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”); and the completion of the barrier wall.

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT – FOURTH QUARTER 2023

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Cape Fear River PFAS Mass Loading Assessment - Fourth Quarter 2023 Report for The Chemours Company, FC, LLC (Chemours).

Appendix A: Cape Fear River PFAS Mass Loading Model

The objective of this appendix is to estimate the mass discharge from the identified PFAS transport pathways using a Cape Fear River mass loading model developed and described in the Cape Fear River Mass Loading Calculation Protocol Version 2 (Geosyntec, 2020a) and to assess the relative contributions by pathway.

Consent Order Addendum – Submission Pursuant to Paragraph 1.b - March 28, 2023

Please find enclosed the Cape Fear River PFAS Mass Loading Assessment – Fourth Quarter 2023 Report.

Q4 2021 Mass Load Assessment Appendices

This appendix presents results from the Q4 2021 sampling events described in Section 2 of the main report.

Appendix A Cape Fear River PFAS Mass Loading Model

The objective of this appendix is to estimate the mass discharge from the identified PFAS transport pathways using a Cape Fear River mass loading model developed and described in the Cape Fear River Mass Loading Calculation Protocol Version 2 (Geosyntec, 2020a) and to assess contributions by pathway.

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - FOURTH QUARTER 2020 REPORT

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Cape Fear River PFAS Mass Loading Assessment report for The Chemours Company, FC, LLC (Chemours). Chemours operates the Fayetteville Works facility in Bladen County, North Carolina (the Site).