Search Results

Below are the search engine results of your query.

Showing 2041-2050 of 2544 results

Q2 2020 Mass Load Assessment Appendices

Chemours’ Thermal Oxidizer Destroying PFAS at Greater Than 99.99% Efficiency

The Chemours Company (Chemours) (NYSE: CC), a global chemistry company with leading market positions in titanium technologies, fluoroproducts and chemical solutions, has announced that testing of its Fayetteville Works thermal oxidizer has demonstrated a 99.99% PFAS destruction efficiency.

Consent Order Paragraph 11.2 Sediment Characterization Plan - Response to DEQ Comments January 22, 2020

Please find enclosed responses to DEQ’s November 20, 2019 comments on Chemours’s Sediment Characterization Plan submitted on August 21, 2019 pursuant to paragraph 11.2 of the Consent Order.

Consent Order Progress Report For Fourth Quarter 2019

Submissions to the State of North Carolina and Cape Fear River Watch

SITE CONVEYANCE NETWORK AND OUTFALL 002 PFAS MASS LOADING CALCULATION PROTOCOL

Geosyntec Consultants of NC, PC (Geosyntec) has prepared this Protocol for establishing current mass loading from Outfall 002 to the Cape Fear River (“Outfall 002 Trendline”) on behalf of The Chemours Company FC, LLC (Chemours) pursuant to the requirements of Paragraph 1(c)(ii) of the Addendum to Consent Order Paragraph 12 (CO Addendum).

Client specific-Polyfluorinated Alkyl Substances (PFAS) in Aqueous Samples Using Isotope Dilution and LC/MS/MS

Interim Seep Remediation Operation and Maintenance Report #11

Interim Seep Remediation Operation and Maintenance Report #11

CAPE FEAR RIVER PFAS LOADING REDUCTION PLAN – SUPPLEMENTAL INFORMATION REPORT

The Cape Fear River PFAS Loading Reduction Plan (Geosyntec, 2019a) was submitted to the North Carolina Department of Environmental Quality (NCDEQ) and Cape Fear River Watch (CFRW) on August 26, 2019 pursuant to Paragraph 12 of the Consent Order among Chemours, NCDEQ, and (CFRW).

2015 06 privacy statement zh tw

Interim SEEP Remediation Operation and Maintenance Report #10

This Operations and Maintenance Report #10 (O&M Report #10) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from July 1 through August 31, 2022.