Search Results

Below are the search engine results of your query.

Showing 2211-2220 of 2801 results

TABLE 3+ ANALYTES AND REPORTING LIMITS FOR 537MM AT SAC

Chemours, Fayetteville Works, North Carolina

Client specific-Polyfluorinated Alkyl Substances (PFAS) in Aqueous Samples Using Isotope Dilution and LC/MS/MS

Fayetteville ISO 9001 Certificate

Development and manufacture of Fluorocarbon Chemicals, Fluorocarbon Resin and Fluorinated Membranes.

Chemours’ Fayetteville Works Site Starts Up Thermal Oxidizer Ahead of Schedule

The Chemours Company (Chemours) (NYSE: CC), a global chemistry company with leading market positions in titanium technologies, fluoroproducts and chemical solutions, has announced the successful start-up of its new thermal oxidizer facility at the company’s Fayetteville Works site

Matrix Interference During PFAS Analysis via Method 537 Mod Max

Geosyntec Consultants of NC, PC (Geosyntec) has prepared this memorandum for The Chemours Company FC, LLC (Chemours) to describe matrix interference observed during the analysis of 70 per- and polyfluoroalkyl substances (PFAS), including 22 Table 3+ PFAS, by the EPA Method 537 Modified Max (“537 Mod Max”; a modified and extended version of EPA Method 537) analytical method.

CO Addendum Paragraph 4(c) – Stormwater Treatment System Capture and Removal Efficiency Report

Pursuant to the requirements of paragraph 4(c) of the Addendum to Consent Order Paragraph 12 (CO Addendum), please find enclosed the Stormwater Treatment System Capture and Removal Efficiency Report (SWTS Capture and Efficiency Report).

STORMWATER TREATMENT SYSTEM CAPTURE AND REMOVAL EFFICIENCY REPORT

This Stormwater Treatment System Removal Efficiency and Capture Report has been prepared pursuant to paragraph 4(c) of the Addendum to Consent Order Paragraph 12 (CO Addendum).

Interim SEEP Remediation Operation and Maintenance Report #12

This Operations and Maintenance Report #12 (O&M Report #12) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from November 1 through December 31, 2022.

Interim SEEP Remediation Operation and Maintenance Report #13

This Operations and Maintenance Report #13 (O&M Report #13) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from January 1 through February 28, 2023.

Paragraph 11(d) Ongoing Sampling – 2021 Quarters 1 and 2 Semi-Annual Report

Pursuant to paragraph 11(d) in the executed Consent Order entered February 25, 2019 amongst Chemours, the North Carolina Department of Environmental Quality (DEQ), and Cape Fear River Watch, please find enclosed the Characterization of PFAS in Process and Non- Process Wastewater and Stormwater: Ongoing Sampling – 2021 Quarters1 and 2 Semi-Annual Report (Paragraph 11(d) Semi-Annual Report).