Resultados de búsqueda

A continuación, encontrará los resultados del motor de búsqueda para su consulta.

Demostración 1851-1860 de 2421 resultados

CFR Long-Term Remedy Performance Monitoring Report #3 July – September 2023

This CFR Long-Term Remedy Performance Monitoring Report #3 (“Report”) has been prepared for the Q3 2023 period of July 1 through September 30, 2023 and documents the continued operation of the interim seep Flow-Through Cells (FTCs), the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP).

TW EIA 107 02 107 04

CHARACTERIZATION OF PFAS IN PROCESS AND NON-PROCESS WASTEWATER AND STORMWATER

Ongoing Sampling – 2021 Quarters 3 and 4 Semiannual Report

Chemours Amended Complaint

Final Surface Water Minor Mod Permit Action Category: B - Industrial Wastewater

Enclosed is a final New Jersey Pollutant Discharge Elimination System (NJPDES) permit action identified above which has been issued in accordance with N.J.A.C. 7:14A.

隱私權聲明

我們知道您重視您的隱私權問題,而Chemours有限公司及其關係企業(以下簡稱 「Chemours」)也是如此,並且希望您知道我們是如何收集、使用及披露資訊。

Submission of Quarterly Report #4 – Characterization of PFAS in Process and Non-Process Wastewater and Stormwater – Chemours Fayetteville Works, Fayetteville, NC April 30, 2020

Chemours is submitting the enclosed Quarterly Report #4 – Characterization of PFAS in Process and Non-Process Wastewater and Stormwater, prepared by our consultant Geosyntec Consultants of NC, P.C..

Seep A Effectiveness Demonstration Report - August 26, 2021

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Interim Seep Remediation Seep A Effectiveness Demonstration Report (“Effectiveness Report”) on behalf of The Chemours Company FC, LLC (Chemours).

Submission of PFAS Non-Targeted Analysis and Methods Interim Report Chemours Fayetteville Works, Fayetteville, NC December 31, 2020

Chemours is submitting the enclosed PFAS Non-Targeted Analysis and Methods Interim Report.

Submission of Quarterly Progress Report Pursuant to Consent Order Paragraph 28 July 28, 2022

Chemours is pleased to submit the enclosed quarterly progress report, as required under paragraph 28 of the Consent Order entered by the Superior Court for Bladen County on February 25, 2019.