Resultados de búsqueda

A continuación, encontrará los resultados del motor de búsqueda para su consulta.

Demostración 2381-2390 de 2414 resultados

Submission Pursuant to Proposed Consent Order Paragraph 11.a

Although the proposed Consent Order has not yet been entered by the Court, Chemours is continuing to proceed on the schedule set forth in the proposed Consent Order with respect to these requirements.

Consent Order Addendum - Submission Pursuant to Paragraph 2.c.v - December 22, 2023

This report is being submitted by Chemours pursuant to paragraph 2.c.v of the Addendum to Consent Order Paragraph 12, entered by the Bladen County Superior Court on October 12, 2020.

Consent Order Addendum – Submission Pursuant to Paragraph 1.b - December 22, 2023

Please find enclosed the Cape Fear River PFAS Mass Loading Assessment – Third Quarter 2023 Report.

Opteon™ Sustainable Solutions HFO Refrigerants Under F-Gas

The Opteon™ XP series was introduced by Chemours as more environmentally sustainable refrigerants with low GWP for refrigeration and air conditioning applications.

Consent Order Addendum - Submission Pursuant to Paragraphs 1.b and 4.b September 30, 2020

Please find enclosed the following documents being submitted by Chemours pursuant to paragraphs 1.b and 4.b of the Addendum to Consent Order Paragraph 12

Stormwater Pollution Prevention Plan for: Chemours Fayetteville Works

SWPPP Preparation Date: 05/31/2020

Opteon™ YF Mobile Refrigerants Brochure

Nearly 62 million vehicles currently on the road in the US use R-1234yf refrigerant.

Groundwater and Seeps Remedy 60% Design Submittal Chemours Fayetteville Works August 2021

This 60% Design report, prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) and GEOServices, LLC (GEOServices) for The Chemours Company FC, LLC (Chemours), describes the components of the remedial action being designed for implementation at the Site pursuant to the requirements of paragraph 3(b) of the Consent Order Paragraph 12 Addendum (COA) among Chemours, the North Carolina Department of Environmental Quality (NCDEQ), and Cape Fear River Watch (CFRW).

TW EIA 4TH 10208 10210

Please find enclosed the Interim Seep Remediation Operation and Maintenance Report #8

Please find enclosed the Interim Seep Remediation Operation and Maintenance Report #8