Search Results

Below are the search engine results of your query.

Showing 2261-2270 of 2808 results

Consent Order Addendum – Submission Pursuant to Paragraph 1.b - March 28, 2023

Please find enclosed the Cape Fear River PFAS Mass Loading Assessment – Fourth Quarter 2023 Report.

Q4 2021 Mass Load Assessment Appendices

This appendix presents results from the Q4 2021 sampling events described in Section 2 of the main report.

Appendix A Cape Fear River PFAS Mass Loading Model

The objective of this appendix is to estimate the mass discharge from the identified PFAS transport pathways using a Cape Fear River mass loading model developed and described in the Cape Fear River Mass Loading Calculation Protocol Version 2 (Geosyntec, 2020a) and to assess contributions by pathway.

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - FOURTH QUARTER 2020 REPORT

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Cape Fear River PFAS Mass Loading Assessment report for The Chemours Company, FC, LLC (Chemours). Chemours operates the Fayetteville Works facility in Bladen County, North Carolina (the Site).

Vinyl Ethers South Carbon Bed and Stack Report

THE CHEMOURS COMPANY FAYETTEVILLE, NORTH CAROLINA

Submission of PFAS Non-Targeted Analysis and Methods Interim Report Chemours Fayetteville Works, Fayetteville, NC - December 23, 2021

Chemours is submitting the enclosed PFAS Non-Targeted Analysis and Methods Interim Report #4.

Submission of PFAS Non-Targeted Analysis and Methods Interim Report Chemours Fayetteville Works, Fayetteville, NC June 30, 2020

Chemours is submitting the enclosed PFAS Non-Targeted Analysis and Methods Interim Report.

Consent Order Progress Report For Second Quarter 2022

Submissions to the State of North Carolina and Cape Fear River Watch

Consent Order Progress Report For Third Quarter 2019

Submissions to the State of North Carolina and Cape Fear River Watch

Response to NCDEQ Comments on Consent Order Paragraph 18 On and Offsite Assessment Report

Geosyntec Consultants of NC, PC (Geosyntec) has prepared this memorandum to support The Chemours Company FC, LLC (Chemours) in responding to comments submitted to Chemours on December 23, 2020 by the North Carolina Department of Environmental Quality (NCDEQ) regarding the On and Offsite Assessment Report (SA Report; Geosyntec, 2019a) for the Chemours Fayetteville Works site (the Site).