Search Results

Below are the search engine results of your query.

Showing 2051-2060 of 2550 results

SITE CONVEYANCE NETWORK AND OUTFALL 002 PFAS MASS LOADING CALCULATION PROTOCOL

Geosyntec Consultants of NC, PC (Geosyntec) has prepared this Protocol for establishing current mass loading from Outfall 002 to the Cape Fear River (“Outfall 002 Trendline”) on behalf of The Chemours Company FC, LLC (Chemours) pursuant to the requirements of Paragraph 1(c)(ii) of the Addendum to Consent Order Paragraph 12 (CO Addendum).

Client specific-Polyfluorinated Alkyl Substances (PFAS) in Aqueous Samples Using Isotope Dilution and LC/MS/MS

Interim Seep Remediation Operation and Maintenance Report #11

Interim Seep Remediation Operation and Maintenance Report #11

CAPE FEAR RIVER PFAS LOADING REDUCTION PLAN – SUPPLEMENTAL INFORMATION REPORT

The Cape Fear River PFAS Loading Reduction Plan (Geosyntec, 2019a) was submitted to the North Carolina Department of Environmental Quality (NCDEQ) and Cape Fear River Watch (CFRW) on August 26, 2019 pursuant to Paragraph 12 of the Consent Order among Chemours, NCDEQ, and (CFRW).

2015 06 privacy statement zh tw

Interim SEEP Remediation Operation and Maintenance Report #10

This Operations and Maintenance Report #10 (O&M Report #10) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from July 1 through August 31, 2022.

Términos de uso

The Chemours Company, sus filiales y sus subsidiarias (denominados colectivamente “Chemours”) le ofrecen este sitio web (el “Sitio”) sujeto a los siguientes términos y condiciones, así como a los términos y condiciones adicionales que se encuentran en todo el Sitio, los cuales se incorporan por referencia (“Términos”).

Response to NCDEQ Comments Dated July 3, 2019 Old Outfall 002

Remedial Options Plan (May 20, 2019)

Consent Order Addendum – Submission Pursuant to Paragraph 1.b - September 30, 2022

Please find enclosed the Cape Fear River PFAS Mass Loading Assessment – Second Quarter 2022 Report.

Please find enclosed the Interim Seep Remediation Operation and Maintenance Report #10

Please find enclosed the Interim Seep Remediation Operation and Maintenance Report #10