Search Results

Below are the search engine results of your query.

Showing 2241-2250 of 2801 results

OUTFALL 002 CHANNEL NEAR DUPONT Groundwater Upwelling Investigation

This report has been prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for the Chemours Company FC, LLC (Chemours) pursuant to paragraph 4(d) of the Addendum to Consent Order1 Paragraph 12 (CO Addendum) of the Consent Order2 (CO) amongst Chemours, the North Carolina Department of Environmental Quality (NCDEQ) and Cape Fear River Watch (CFRW).

Chemours Fayetteville Works Site Awards Five Scholarships to Local Students

Future of Chemistry Scholarship program reflects the company’s commitment to communities where the company operates

Chemours Amended Complaint

The Chemours Company Response To Special Rapporteur Letter Ref: AL OTH 113/2023

The Chemours Company (“Chemours”) is pleased to reply to the letter dated 25 September 2023 sent by (i) the Special Rapporteur on the implications for human rights of the environmentally sound management and disposal of hazardous substances and wastes, (ii) the Working Group on the issue of human rights and transnational corporations and other business enterprises, (iii) the Special Rapporteur on the issue of human rights obligations relating to the enjoyment of a safe, clean, healthy and sustainable environment, (iv) the Special Rapporteur on the right to food, and (v) the Special Rapporteur on the human rights to safe drinking water and sanitation (collectively, “Independent Experts”).

Cape Fear River PFAS Mass Loading Assessment Report (12/2020)

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Cape Fear River PFAS Mass Loading Assessment report for The Chemours Company, FC, LLC (Chemours).

INTERIM SEEP REMEDIATION OPERATION AND MAINTENANCE REPORT #1

Geosyntec Consultants of NC, PC (Geosyntec) has prepared this Interim Seep Remediation Operation and Maintenance (O&M) Report #1 (“O&M Report”) on behalf of The Chemours Company FC, LLC (Chemours) to provide a bi-monthly (every two months) summary report of Operations and Maintenance for the flow-through cell (FTC) installed as the interim remediation system at Seep C at the Chemours Fayetteville Works Site (the Site).

Stormwater Pollution Prevention Plan for: Chemours Fayetteville Works

SWPPP Preparation Date: 05/31/2020

Submission of Thermal Oxidizer Emission Test Reports Pursuant to Consent Order Paragraph 8.c.i April 3, 2020

By letter dated March 30, 2020, Chemours submitted the Thermal Oxidizer Performance Test Report, with attached efficiency test reports for testing events.

Interim SEEP Remediation Operation and Maintenance Report #2

This Operations and Maintenance Report #2 (O&M Report #2) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A and C from March 1 through April 30, 2021.

Per- and Polyfluorinated Alkyl Substances (PFAS) in Water, Soils, Sediments and Tissue

Method 537 (Modified), Method PFAS by LCMSMS Compliant with QSM Table B-15, Revision 5.3 and higher