Résultats de recherche

Montrant 1491-1500 de 2423 résultats

Submission of PFAS Non-Targeted Analysis and Methods Interim Report Chemours Fayetteville Works, Fayetteville, NC - June 29, 2023

Chemours is submitting the enclosed PFAS Non-Targeted Analysis and Methods Interim Report #7.

Consent Order Progress Report For Third Quarter 2021

Submissions to the State of North Carolina and Cape Fear River Watch

Preliminary Assessment/Site Investigation Chemours Chambers Works Deepwater, New Jersey

AECOM, at the request of Norris, McLaughlin & Marcus (NMM), has prepared this Preliminary Assessment/Site Investigation (PA/SI) Report for the Chemours (formerly DuPont) Chambers Works Complex (the site) located in Deepwater, New Jersey

Sediment Characterization Report October 23, 2020

On behalf of Chemours, please see the enclosed Sediment Characterization Report prepared pursuant to paragraph 11.2 of the Consent Order entered by the Superior Court for Bladen County on February 25, 2019.

Interim SEEP Remediation Operation and Maintenance Report #13

This Operations and Maintenance Report #13 (O&M Report #13) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from January 1 through February 28, 2023.

Chemours Chambers Works Surveying and PFAS Sampling Program Residential GAC System Results – 2Q

The E.I. du Pont de Nemours and Company voluntarily conducted a residential drinking-water well surveying and sampling program within a two-mile radius surrounding the Chambers Works Facility in Deepwater, New Jersey in 2009.

TW EIA 109 08 109 10

CFR Long-Term Remedy Performance Monitoring Report #3 July – September 2023

This CFR Long-Term Remedy Performance Monitoring Report #3 (“Report”) has been prepared for the Q3 2023 period of July 1 through September 30, 2023 and documents the continued operation of the interim seep Flow-Through Cells (FTCs), the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP).

Consent Order Addendum – Submission Pursuant to Paragraph 1.b - December 22, 2023

Please find enclosed the Cape Fear River PFAS Mass Loading Assessment – Third Quarter 2023 Report.

Nonprofit to hold 9th flood relief river cleanup in Waverly since 2020 with help from fleet upgrades funded by Chemours Donations