Marques et produits
Chemours utilise le pouvoir de la chimie pour créer de meilleures solutions fiables.
L’avenir des transports est là.
Découvrez comment Chemours stimule l’innovation dans le domaine des véhicules électriques avec notre dernière gamme de matériaux haute performance.
Durabilité
Création d’un monde meilleur grâce à une chimie responsable.
Nos objectifs à l’horizon 2030
Nos progrès dans l’atteinte des objectifs d’engagement en matière de responsabilité sociale d’entreprise de Chemours.
La prochaine normalité
La chimie aidera la société à naviguer dans une ère nouvelle et meilleure.
Montrant 1791-1800 de 2416 résultats
Chemours is submitting the enclosed Quarterly Report #3 – Characterization of PFAS in Process and Non-Process Wastewater and Stormwater, prepared by our consultant Geosyntec Consultants of NC, P.C.
Process and Non-Process Wastewater and Stormwater
Chemours Fayetteville Works, North Carolina
Paragraph 14 of the Consent Order states: “Within thirty (30) days of entry of this Consent Order, Chemours shall submit a plan and proposed schedule for review and approval by DEQ for funding and facilitating the conducting of an initial set of toxicity studies by a qualified third party approved by DEQ relating to both toxicity assays informative to human health and aquatic life sufficient to aid in development of surface water and groundwater regulatory standards for up to five PFAS as determined by DEQ. The plan shall provide for the studies and parameters identified in Attachment B as well as technologically feasible dosing parameters to be agreed upon by Chemours and DEQ.”
ERM Certification and Verification Services (‘ERM CVS’) was engaged by The Chemours Company (‘Chemours’) to provide limited assurance in relation to the indicators for the year ending December 31st, 2018, set out below and presented in the 2020 Chemours Corporate Responsibility Commitment (CRC) Index Report (the ‘CRC Report’).
Pursuant to Paragraph 8.d of the Consent Order, please find enclosed the October monthly emissions report for GenX Compounds from Fayetteville Works, prepared with support from our consultant, ERM NC, Inc. (“ERM”).
Pursuant to the requirements of Paragraph 17 of the proposed Consent Order, Chemours is notifying the Division of Waste Management of the completion of the permanent lining of the north sedimentation pond.
This Interim Four Counties Sampling and Drinking Water Plan has been prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours).
Future of Chemistry Scholarship program reflects the company’s commitment to communities where the company operates
Utilisez notre base de données pour accéder aux FDS des produits.
Chemours offre de précieuses solutions à diverses industries à travers le monde.
Le monde dépend du pouvoir de la chimie.