検索結果

お問い合わせに対する検索エンジンの検索結果を次に示します。

表示する 1221-12302391 結果

HOW LUBRICANTS DRIVE SAVINGS AND PRODUCTIVITY

When it Comes to Lubricants, the Lowest Price isn’t Always the Best Value

Chemours Chambers Works Surveying and PFAS Sampling Program Residential GAC System Results – 1Q24

The E.I. du Pont de Nemours and Company voluntarily conducted a residential drinking-water well surveying and sampling program within a two-mile radius surrounding the Chambers Works Facility in Deepwater, New Jersey in 2009.

Multi-site RC 14001 Certificate

This is to certify that the Management System of: The Chemours Company FC, LLC 1007 Market Street, Wilmington, DE, 19898, United States has been approved by Lloyd's Register to the following standards: RC 14001:2015 Technical Specification 151.06

Chemours Delivery Driver Requirements and Rules

The purpose of this document is to provide all drivers and other visitors with the information they need to ensure their safety while on our sites and follow our safety procedures.

CFR Long-Term Remedy Performance Monitoring Report #3 July – September 2023

This CFR Long-Term Remedy Performance Monitoring Report #3 (“Report”) has been prepared for the Q3 2023 period of July 1 through September 30, 2023 and documents the continued operation of the interim seep Flow-Through Cells (FTCs), the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP).

Interim SEEP Remediation Operation and Maintenance Report #6

This Operations and Maintenance Report #6 (O&M Report #6) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from November 1 through December 31, 2021.

DEQ’s November 3, 2021 “Notice Regarding Chemours’ Obligations Under Consent Order and 15A NCAC 02L .0106 - Offsite Groundwater Assessment and Provision of Replacement Drinking Water Supplies”

As requested by DEQ, Chemours is submitting herewith a “Framework to Assess Table 3+ PFAS in New Hanover, Brunswick, Columbus, and Pender Counties” (the “Assessment Framework”) and an “Interim Four Counties Sampling and Drinking Water Plan (New Hanover, Brunswick, Columbus, and Pender Counties)” which will include the sampling of groundwater from private wells in the four counties as requested by the well owners.

TW EIA 106 02 106 04

Stormwater Pollution Prevention Plan for: Chemours Fayetteville Works

SWPPP Preparation Date: 05/31/2020

Interim SEEP Remediation Operation and Maintenance Report #5

This Operations and Maintenance Report #5 (O&M Report #5) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from September 1 through October 31, 2021.