検索結果

お問い合わせに対する検索エンジンの検索結果を次に示します。

表示する 1321-13302391 結果

Sediment Characterization Plan August 2019

This Characterization plan (the Characterization Plan) was prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours) to provide a plan for sampling and analysis of sediment in the Cape Fear River.

Freon™ 410a-407c Properties, Uses, Storage & Handling Bulletin

Chlorodifluoromethane (R-22 or HCFC-22) has been used as a refrigerant in various refrigeration, industrial cooling, air conditioning, and heating applications for over six decades.

Paragraph 11(d) Ongoing Sampling – 2021 Quarters 1 and 2 Semi-Annual Report

Pursuant to paragraph 11(d) in the executed Consent Order entered February 25, 2019 amongst Chemours, the North Carolina Department of Environmental Quality (DEQ), and Cape Fear River Watch, please find enclosed the Characterization of PFAS in Process and Non- Process Wastewater and Stormwater: Ongoing Sampling – 2021 Quarters1 and 2 Semi-Annual Report (Paragraph 11(d) Semi-Annual Report).

Fayetteville Works Corrective Action Plan 12312019

This Corrective Action Plan (CAP), prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours), describes proposed remediation activities to address per- and polyfluoroalkyl substances (PFAS) in groundwater and surface waters at the Chemours Fayetteville Works Site (the Site).

IXM MANUFACTURING PROCESSES POLYMERS STACK EMISSIONS TEST REPORT TEST DATES: 25-26 SEPTEMBER 2019

THE CHEMOURS COMPANY FAYETTEVILLE, NORTH CAROLINA

Chemours Schedules Information Sessions on Planned Production Expansion

Responsible Care® Guiding Principles (affirmed by CEO)

Information Pursuant to Paragraph 21 of Proposed Consent Order

Pursuant to that paragraph, Chemours hereby notifies the North Carolina Department of Environmental Quality (“DEQ”), and hereby seeks DEQ’s approval, that Chemours intends to use TestAmerica Laboratories, Inc. and Lancaster Laboratories Inc. as third-party laboratories to implement the testing described in Paragraph 21.

DEQ Approval of Barrier Wall and Groundwater Extraction System 90% Design Report

October 25, 2022

TW EIA 105 08 105 10