検索結果

お問い合わせに対する検索エンジンの検索結果を次に示します。

表示する 1101-11102392 結果

Out Outfall 002 GAC Pilot Study Interim Results Report Chemours Fayetteville, North Carolina Facility August 2019

Parsons Infrastructure (Parsons) is pleased to present this interim report summarizing results obtained todate during operation of the Old Outfall 002 (OOF2) GAC pilot treatment system.

Interim Four Counties Sampling and Drinking Water Plan (New Hanover, Brunswick, Columbus and Pender Counties)

This Interim Four Counties Sampling and Drinking Water Plan has been prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours).

Consent Order Addendum – Submission Pursuant to Paragraph 1.b - March 31, 2022

Please find enclosed the Cape Fear River PFAS Mass Loading Assessment – Fourth Quarter 2021 Report

Please find enclosed the Interim Seep Remediation Operation and Maintenance Report #14

Please find enclosed the Interim Seep Remediation Operation and Maintenance Report #14

Opteon™ XL20 Thermodynamic Properties (SI)

Thermodynamic Properties of Opteon™ XL20 (R-454C) SI Units

Opteon™ XL20 P-H Diagram (Eng)

Conduta do Fornecedor

Vivendo com Integridade. Vivendo a Química.

Consent Order Progress Report For Third Quarter 2019

Submissions to the State of North Carolina and Cape Fear River Watch

92% Facility-Wide Reduction of GenX Compounds Emissions Pursuant to Consent Order Paragraph 8.b January 21, 2020

This submittal is intended to satisfy Paragraph 8.b of the Consent Order, which requires Chemours to submit a final report documenting that Facility-wide air emissions of GenX Compounds from December 31, 2018 through December 30, 2019 have been reduced by at least 92% from 2017 Total Reported Emissions.

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - APPENDIX A

This appendix presents results from the Q2 2023 sampling events described in Section 2 of the main report.