検索結果

お問い合わせに対する検索エンジンの検索結果を次に示します。

表示する 1111-11202392 結果

ON AND OFFSITE ASSESSMENT Chemours Fayetteville Works: October 31, 2019

This report, the Site Assessment Report (SA), summarizes On and Offsite Assessment activities completed by Geosyntec Consultants and others at the Chemours Fayetteville Works facility (Site) pursuant to Paragraph 18 of the February 25, 2019 Consent Order (CO) among Chemours, the North Carolina Department of Environmental Quality (NCDEQ) and Cape Fear River Watch (CFRW).

ISO Cert DeLisle

The manufacture and supply of a range of titanium dioxide pigments

TW EIA 103 08 103 10

Interim SEEP Remediation Operation and Maintenance Report #10

This Operations and Maintenance Report #10 (O&M Report #10) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from July 1 through August 31, 2022.

Chemours Offers Carbon Filtration Units to Owners of Impacted Wells

Given the success of its granular activated carbon (GAC) pilot filtration program, The Chemours Company (Chemours) (NYSE: CC) is offering to install and maintain whole-house GAC filtration systems for all area residents whose drinking water wells have tested above the state provisional health goal of 140 parts per trillion (ppt) for HFPO-Dimer Acid (GenX).

Corpus Christi ISO 9001 Certificate

The manufacture of Fluorochemicals

FLUOROMONOMERS MANUFACTURING PROCESS VE SOUTH CARBON BED REMOVAL EFFICIENCY AND VE SOUTH STACK EMISSIONS TEST REPORT

TEST DATES: 16 AND 17 JULY 2019

PLUMESTOP PHASE 1 PILOT STUDY AT OLD OUTFALL 002

CHEMOURS FAYETTEVILLE WORKS RCRA PERMIT NO. NCD047368642-R2-M3

Work Plan for Toxicity Studies Pursuant to Consent Order Paragraph 14 March 27, 2019

Paragraph 14 of the Consent Order states: “Within thirty (30) days of entry of this Consent Order, Chemours shall submit a plan and proposed schedule for review and approval by DEQ for funding and facilitating the conducting of an initial set of toxicity studies by a qualified third party approved by DEQ relating to both toxicity assays informative to human health and aquatic life sufficient to aid in development of surface water and groundwater regulatory standards for up to five PFAS as determined by DEQ. The plan shall provide for the studies and parameters identified in Attachment B as well as technologically feasible dosing parameters to be agreed upon by Chemours and DEQ.”

RESPONSES TO COMMENTS

TABLE 1 - PARAGRAPH 11(b) CHARACTERIZATION PLAN