検索結果

お問い合わせに対する検索エンジンの検索結果を次に示します。

表示する 1761-17702488 結果

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - APPENDIX A

This appendix presents results from the Q3 2023 sampling events described in Section 2 of the main report.

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - APPENDIX A

This appendix presents results from the Q2 2023 sampling events described in Section 2 of the main report.

Submission of Quarterly Progress Report Pursuant to Consent Order Paragraph 28 - January 29, 2024

Chemours is pleased to submit the enclosed quarterly progress report, as required under paragraph 28 of the Consent Order entered by the Superior Court for Bladen County on February 25, 2019.

Media Advisory: Chemours Files Appeal of the Final NPDES Permit (NC0090042)

Chemours regrets that we must file an appeal of the Final NPDES Permit (NC0090042) issued by the North Carolina Department of Environmental Quality, Division of Water Resources (NCDEQ) dated September 15, 2022, related to the water treatment system for our mile-long barrier wall designed to further reduce PFAS loading from groundwater into the Cape Fear River.

CFR Long-Term Remedy Performance Monitoring Report #5 October – January - March 2024

This CFR Long-Term Remedy Performance Monitoring Report #5 (“Report”) has been prepared for the Q1 2024 period of January 1 through March 31, 2024 and documents the operation of the interim seep Flow-Through Cells (FTCs), the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP).

CAPE FEAR RIVER PFAS LOADING REDUCTION PLAN – SUPPLEMENTAL INFORMATION REPORT

The Cape Fear River PFAS Loading Reduction Plan (Geosyntec, 2019a) was submitted to the North Carolina Department of Environmental Quality (NCDEQ) and Cape Fear River Watch (CFRW) on August 26, 2019 pursuant to Paragraph 12 of the Consent Order among Chemours, NCDEQ, and (CFRW).

Submission of PFAS Non-Targeted Analysis and Methods Interim Report Chemours Fayetteville Works, Fayetteville, NC - December 28, 2022

Chemours is submitting the enclosed PFAS Non-Targeted Analysis and Methods Interim Report #6.

Submission of PFAS Non-Targeted Analysis and Methods Interim Report Chemours Fayetteville Works, Fayetteville, NC - June 29, 2023

Chemours is submitting the enclosed PFAS Non-Targeted Analysis and Methods Interim Report #7.

Submission of PFAS Non-Targeted Analysis and Methods Interim Report Chemours Fayetteville Works, Fayetteville, NC - June 26, 2024

Chemours is submitting the enclosed PFAS Non-Targeted Analysis and Methods Interim Report #9.

Submission of Quarterly Report #4 – Characterization of PFAS in Process and Non-Process Wastewater and Stormwater – Chemours Fayetteville Works, Fayetteville, NC April 30, 2020

Chemours is submitting the enclosed Quarterly Report #4 – Characterization of PFAS in Process and Non-Process Wastewater and Stormwater, prepared by our consultant Geosyntec Consultants of NC, P.C..