検索結果

お問い合わせに対する検索エンジンの検索結果を次に示します。

表示する 1771-17802488 結果

Submission of PFAS Non-Targeted Analysis and Methods Interim Report Chemours Fayetteville Works, Fayetteville, NC - December 22, 2023

Chemours is submitting the enclosed PFAS Non-Targeted Analysis and Methods Interim Report #8.

CHARACTERIZATION OF PFAS IN PROCESS AND NON-PROCESS WASTEWATER AND STORMWATER

Ongoing Sampling – 2021 Quarters 3 and 4 Semiannual Report

Consent Order Addendum - Submission Pursuant to Paragraph 2.c.v

Please find enclosed the Groundwater and Seeps Remediation Report #1.

WWTP TABLE 3+ PFAS LOADING ASSESSMENT

This report was prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours) pursuant to the requirements of Paragraph 4(d) of the Addendum to Consent Order Paragraph 12 (CO Addendum) amongst Chemours, the North Carolina Department of Environmental Quality (NCDEQ), and Cape Fear River Watch.

Interim Four Counties Sampling and Drinking Water Plan (New Hanover, Brunswick, Columbus and Pender Counties)

This Interim Four Counties Sampling and Drinking Water Plan has been prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours).

Interim Four Counties Sampling and Drinking Water Plan (New Hanover, Brunswick, Columbus and Pender Counties)

This Interim Four Counties Sampling and Drinking Water Plan has been prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours).

Groundwater and SEEPS remediation Report #1 January - March 2023

This Groundwater and Seeps Remediation Report #1 (“Report”) has been prepared to document the commissioning and startup activities of the groundwater extraction and conveyance system (GWEC) and the groundwater treatment plant (GWTP) from the period of January 1 through March 31, 2023.

Interim SEEP Remediation Operation and Maintenance Report #10

This Operations and Maintenance Report #10 (O&M Report #10) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from July 1 through August 31, 2022.

Interim SEEP Remediation Operation and Maintenance Report #14

This Operations and Maintenance Report #14 (O&M Report #14) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from March 1 through April 30, 2023.

Interim SEEP Remediation Operation and Maintenance Report #4

This Operations and Maintenance Report #4 (O&M Report #4) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from July 1 through August 31, 2021.