Interim SEEP Remediation Operation and Maintenance Report #12
This Operations and Maintenance Report #12 (O&M Report #12) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from November 1 through December 31, 2022.
Interim SEEP Remediation Operation and Maintenance Report #13
This Operations and Maintenance Report #13 (O&M Report #13) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from January 1 through February 28, 2023.
CHARACTERIZATION OF PFAS IN PROCESS AND NON-PROCESS WASTEWATER AND STORMWATER Ongoing Sampling – 2021 Quarters 1 and 2 Semi-Annual Report
This report was prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours) as the first semiannual report for Ongoing Sampling of the concentrations of per- and polyfluoroalkyl substances (“PFAS”) in process wastewater, non-process wastewater, and stormwater at the Chemours Fayetteville Works, North Carolina site (the Facility, Figure 1).