検索結果

お問い合わせに対する検索エンジンの検索結果を次に示します。

表示する 1911-19202488 結果

Consent Order Progress Report For Third Quarter 2023

Submissions to the State of North Carolina and Cape Fear River Watch

Framework to Assess Table 3+ PFAS in New Hanover, Brunswick, Columbus, and Pender Counties

This document was prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours) to provide a framework to assess Table 3+ per- and polyfluoroalkyl substances (PFAS)1 in soil and groundwater in New Hanover, Brunswick, Columbus, and Pender Counties (the counties) of North Carolina.

PRIVATE WELL SAMPLING IN THE FOUR COUNTIES AREA

Submission of Barrier Wall and Groundwater Extraction System 60% Design Report, Chemours Fayetteville Works, Fayetteville, NC August 13, 2021

Chemours is submitting the Barrier Wall and Groundwater Extraction System 60% Design Report. This report has been prepared pursuant to Paragraph 3.b in the Addendum to Consent Order Paragraph 12 entered by the Bladen County Superior Court on October 12, 2020, which is incorporated into the terms of the Consent Order entered February 25, 2019 between Chemours and the North Carolina Department of Environmental Quality (DEQ) with the Cape Fear River Watch (CFRW).

Consent Order Addendum - Submission Pursuant to Paragraph 4(d) November 30, 2020

Paragraph 4(d) of the Addendum to Consent Order Paragraph 12 requires that Chemours complete an investigation to determine whether DuPont non-contact cooling water is causing groundwater containing PFAS to infiltrate into the outfall channel.

THERMAL OXIDIZER CONTROL EFFICIENCY TEST REPORT TEST DATES: 3-4 JANUARY 2020

THE CHEMOURS COMPANY FAYETTEVILLE, NORTH CAROLINA

Cape Fear River PFAS Mass Loading Assessment Cover Letter (12/2020)

Please find enclosed the Cape Fear River PFAS Mass Loading Assessment - Third Quarter 2020 Report

Consent Order Addendum - Submission Pursuant to Paragraph 1.b March 31, 2021

Please find enclosed the Cape Fear River PFAS Mass Loading Assessment - Fourth Quarter 2020 Report

PRE-DESIGN INVESTIGATION SUMMARY - UPDATED Chemours Fayetteville Works Version 2: June 29, 2021

Geosyntec Consultants of NC, P.C. (Geosyntec) and GEOServices, LLC (GEOServices) have prepared this Pre-Design Investigation (PDI) Report Version 2 for The Chemours Company, FC, LLC (Chemours).

Groundwater and Seeps Remedy 60% Design Submittal Chemours Fayetteville Works August 2021

This 60% Design report, prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) and GEOServices, LLC (GEOServices) for The Chemours Company FC, LLC (Chemours), describes the components of the remedial action being designed for implementation at the Site pursuant to the requirements of paragraph 3(b) of the Consent Order Paragraph 12 Addendum (COA) among Chemours, the North Carolina Department of Environmental Quality (NCDEQ), and Cape Fear River Watch (CFRW).